BESS Transformer for Battery Energy Storage Systems
BESS Transformer Supplier for Battery Energy Storage Systems

China Energy Storage Plant Transformer Supplier

China Energy Storage Plant Transformer Supplier

Jinan Omek Electric Power Co., Ltd. manufactures distribution transformers and related switchgear equipment for various industries. Among them, our transformers have a great role play in the BESS battery energy storage system.

With the increase in renewable energy development, our BESS transformers have achieved energy storage, smooth voltage conversion and efficient power supply. The most important, we helped our client get more revenue.

Our two large series transformers for BESS – oil immersed transformer and the dry type transformer can meet your requirement for different operation conditions. Both of them are with bi-directional design and K13 harmonic resistant function. They work flexibly and stably between the PCS and the power grid.

 

Send inquiry Now

Great Role of BESS Transformer in Battery Energy Storage System

OMEK BESS transformer connects with the PCS inverter. It is used to adjust the low voltage such as 0.69 kV from the inverter to a medium voltage such as 33 kV. After voltage steps up, the electricity can easily connect to the medium voltage collection system. That achieves a low loss in long line transmission.

Why BESS needs a transformer? For renewable energy such as solar and wind, it is hard for them to always provide a stable and continuous energy supply to people. In order to collect the redundant electricity for continuous supply, and deliver them in peak period or when in a short supply,transformers in BESS have taken this role.

https://omekpower.com/wp-content/uploads/2026/11/Great-Role-of-BESS-Transformer-in-Battery-Energy-Storage-System-11.23.webp

Energy Storage Dedicated Transformer

01

Oil-Immersed BESS Transformer

OMEK’s high capacity oil immersed transformer for BESS is ideal for outdoor and remote energy storage base. It has a relatively lower initial investment, but has stronger overload capacity. That is to say, it deals very well with the short-time overload impact in the BESS.

BESS transformer with oil filled are the first chosen for many BESS projects, such as utility scale energy storage stations and solar-plus-storage hybrid plants. It serves a long service life for the battery energy storage transformer system, and contributes a continuous large revenue for project owners.

energy storage dedicated Oil Immersed transformer
energy storage dedicated Oil type transformer
02

Oil-Immersed BESS Transformer Specification

  • Capacity range: 30-15000 kVA
  • Voltage: up to 38.5 kV
  • Frequency: 50 Hz / 60 Hz optional
  • Vector group: Dyn11 standard, other connections are also available
  • Cooling method: ONAN / ONAF / KNAN
  • Special design: K-factor harmonic design, bidirectional power flow design
  • Temperature rise: 55K (oil) / 65K (winding)
  • Insulation fluid: Mineral oil and FR3® natural ester fluid
  • Winding option: Dual split winding (for dual PCS connection)
  • Tap changer: OLTC
  • Winding material: pure copper
  • Installation: Outdoor, pad mounted or free-standing (open type)
  • IP protection: per your specific needs
03

Energy Storage Dry Type Transformer

The energy storage dedicated dry type transformer OMEK produced works as a step up as well as a isolation transformer between the PCS and the medium voltage power grid.

It is not a normal cast resin dry type transformer. Instead, it is customized to meet the frequent power charging and discharging, power switching and high harmonics condition in BESS system.

It has our compact design and without oil. So it can fully meet your requirement for strict oil prohibition and fire control.

energy storage dedicated dry type transformer
energy storage dedicated dry-type transformer
04

Energy Storage Dry Type Transformer Specification

  • Capacity range: 30–5000 kVA
  • Voltage: up to 38.5 kV
  • Frequency: 50/60Hz
  • Vector group: Dyn11 standard, others for customization
  • Cooling method: AN / AF
  • Insulation class: F / H
  • Temp rise: 80K (F) /100K (H)
  • IP: IP00 / IP20 / IP23 / IP31 / IP54 (per your request)
  • Winding: Dual split optional
  • Special design: K-factor harmonic design, bidirectional power flow design, electrostatic shield
  • Standard: IEC 60076-11 and IEC 60076-16

Customized Transformers for BESS

Being a trusted Chinese supplier of energy storage plant transformers, OMEK is supported by full0cycle technical service and IEC converter duty certification, our customization is reliable and trusted.

  • Omek Bess transformer engineer calculates voltage matching.
    Match your voltage and total load

    Whether for a 1MW energy storage system or a 10MW BESS system, we will customize our voltage and capacity for the battery storage transformers, to perfectly fit the total power and the grid voltage.

  • OMEK BESS transformers' impedance, wiring group & tap range are all designed based on the parameters of the PCS.
    Fit PCS electric parameters

    OMEK BESS transformers’ impedance, wiring group & tap range are all designed based on the parameters of the PCS, switch cabinets and the integrated grid system. We make sure they work properly in the system.

  • Bess transformer capacity expansion energy storage solution
    Adapt to Operating Duty

    Our battery energy storage system transformers are designed based on our serious consideration of frequent power change, repeated power charging and discharging. So we do special designs on temperature rise, loss, thermal design, etc.

  • OMEK customized our transformers for BESS on dimensions, cable connection positions, terminal layout, and enclosure design.
    Design Based On Your Installation Layout

    We customized our transformers for BESS on dimensions, cable connection positions, terminal layout, and enclosure design. Our pad mounted BESS transformers can fit for a containerized or skid-mounted layout.

OMEK's Design to Better Handle the Challenges

Traditional withstand voltage tests can’t fully prove the BESS transformer reliability

OMEK adopts multiple combined reactor groups to process the AC withstand voltage test. We make our BESS transformer with high reliable insulation performance before delivered.

Are you wondering if the transformer matches your PCS and grid requirements?

Take it easy. OMEK’s engineer will connect with you closely to provide detailed guidance for any necessary data. Before design, we will know exactly about your PCS output voltage, rated power, grid voltage, etc. To ensure what we get is what we made, to perfectly match the whole system.

In BESS, the power flows back and force for charging and discharging, can your battery energy storage transformer bear this?

Our BESS transformers design is different from the transformers for normal applications. They are specially optimized in the winding structure, temperature rise, insulation and magnetic circuit design. All of these designs ensure stable power conversion on both sides.

Smart Grid Energy Storage Transformer Solution

Communication on your bess system background
OMEK specialists will communicate with you to learn your grid connection requirement, on-spot condition and know clearly about your core concerns.
Make sure exact parameters
These key parameters include capacity, voltage class, impedance, cooling method and protection requirements. Each will match your needs accurately.
Customize design
After confirming all the parameters, we will design specially on the BESS transformer structure, accessories and layout. Let it fit your special project requirement.
Strict testing
Each of our BESS transformers must be tested for routine tests and typical tests. We also adopt a special withstand voltage test that is different from that of a normal.
Fast delivery to you
Our sales personnel will arrange reliable shipment agreed by you, and report the progress to you regularly. They will ensure the BESS transformer arrive to you safely.
VIP service support
You will enjoy our VIP service on installation guidance, operation suggestion, running guidance, or integration with solar or wind power. We ensure your whole system runs smoothly.

Why Choose OMEK's BESS Transformer?

OMEK’s expertise in BESS application shows in our professional engineers, our certification, production ability, fast delivery and awesome service. All of those make us as a top energy storage plant transformer factory in China.

  • Icon
    1

    OMEK has engineers that have 20 years experience in the BESS area, they provide you with professional technical integration solutions and guidance

  • Icon
    2

    Our transformers are produced according to ISO, IEEE, ANSI standards strictly and meet many other countries’ standards

  • Icon
    3

    We own 3 large plants of transformers for BESS in China, and own 7 large branch factories in countries like Ethiopia and Indonesia. We have a large stock.

  • Icon
    4

    We provide a 3-year warranty. And this can be negotiated to let it be longer based on your requirement.

  • Icon
    5

    We have large export cases in Europe, Australia and Canada, etc. We delivered multiple storage and solar-storage hybrid BESS projects.

OMEK Energy Storage Transformer Applications

OMEK energy storage transformers are widely applied in various scenarios:

FAQ

What's the role difference between a BESS transformer and a solid state transformer energy storge integration?

When BESS transformer integrates with energy storage, it has three main functions – change voltage, electric isolation and bear the frequent fluctuations and harmonics.

But for a solid state transformer, when it integrated with energy storage, it replaces the PCS, the BESS transformer, moreover, it is proactive to manage the power quality of the whole system. However, it is more expensive than the total cost of a PCS, a BESS transformer and switchgear.

Read More

Contact with Us!

Solve the problem and obtain the quotation.
Wide Contact Form 2